LAST PROJECTS |
|
|
 |
Casa Hurdle |
|
Nova is currently working on a large remodeling in a house located in the exclusive neighborhood of Las Huacas de Nosara in the EE section. Nova is building approximate 300 square meters of outdoor areas including 2 terraces, balconies and a cirdular tradicional Palapa. The finishing's used for this project are of Coral Stone for the exterior floors and rustic Colombian ceramic tile for the interior (Alfagres) and a combination of solid teak cealings with real clay tile for the house and palm thatch for the rancho. For the interior Nova is using granite countertops (kitchen & bathrooms), new teak closets, travertine vessels basins, etc. We will be posting some pictures as the work progresses.
Estimated time for completion 5 Months (January 2012) |
|
Casa Fullerton |
|
Casa Fullerton is a one story home of 1,100 square feet and features 2 bedrooms and 2 bathrooms. This house is been design to maximize the space of the interiors and to allow an easy flow between the different areas of the house. Time of completion: 4 months. |
|
Casa Westbrook |
|
This is a two story home of 1,500 square feet. It features 2 bedrooms, 2 1/2 bathrooms, open living space and kitchen, washer/dryer room, storage area and covered parking space.
The house was built using high quality finishing’s such as pochote hardwood ceilings, custom made wood cabinetry, clay tile roof, ceramic tile floors, etc. Time of completion: 4,5 months. |
|
Paseo del Sol |
|
Paseo del Sol is a condominium project of 10 individual homes located on the lush L section of the "American Project" of Nosara. Nova development Group were responsible for the management of the entire project from beginning to end including permitting and planning, design, construction, quality control, accounting, electromechanical and landscaping.
The project was completed in a period of 18 months. |
|
Del Mar Academy |
|
Nova Development Group was involved in the development of the private bilingual school Del Mar Academy in the capacity of project management. On the 7 acre campus area a 6 classroom pod, a Pre-K classroom and a cafeteria were built in two phases, with phase one including the infrastructure/utilities such as potable water system, electric and telecommunications, drainage system and landscaping. The second phase consisted in a 5,000 sq ft pod, a 2,000 sq ft classroom for toddlers and Pre-K and a multipurpose sporting court.
Subcontracting, quality control, scheduling and accounting were the daily responsibilities of Nova. |
|
|
 |
|
|
| |
|